Full-Life Technologies opens an integrated actinium-225 plant in Gembloux

On 24 November 2026, Full-Life Technologies announced the grand opening of its manufacturing and radiolabeling facility in Gembloux, Belgium, marked by a ribbon-cutting ceremony. The privately held, fully integrated, clinical-stage radiopharmaceutical company presents the site as an integrated plant that will bring together production of the radioisotope actinium-225 (Ac-225) and the final drug product for worldwide distribution, primarily to support Full-Life's drug development, clinical trials and, in time, commercial product.
The investment in the Gembloux facility represents a commitment of more than 100 million euros, or about 110 million US dollars, through to the start of production. The 4,000-square-metre facility, which spans two floors, has an estimated annual capacity of 26 curies (Ci) of Ac-225, equivalent to approximately 100,000 patient doses per year. That figure is a capacity estimate, not a volume already being manufactured: production has not started.
A facility opened, but not yet in operation
Full-Life broke ground on the facility in December 2023 and received its nuclear permit from the Belgian Federal Agency for Nuclear Control (FANC) in March 2024. In August 2026, the company announced that construction was complete and that it had received authorization to begin commissioning and initial ramp-up of the accelerator. Installation of the accelerator is now complete, and installation of the remaining equipment is planned over the coming months.
Full-Life has agreed to a ramp-up plan with FANC, and before operations begin, FANC will verify that the facility and its safety systems have been built and integrated as defined in the safety dossier. The ceremony held on 24 November in Gembloux was organised to tour the facility and highlight the infrastructure and the electron accelerator, with dignitaries, members of the industry and media, and the Full-Life team. The press release does not name those dignitaries, apart from the speakers quoted below.
Isotope production and drug product on one site
"Opening this facility is a proud moment for our team in Belgium and globally, where deep industrial, pharmaceutical, scientific and nuclear expertise helped make this site possible," said Philippe van Put, General Manager of Full-Life Technology Europe. "With two of our programs in Phase 1, dependable access to actinium-225 is more important than ever. By bringing isotope production and final drug product manufacturing together at one site, we are building control over cost, speed and continuity of supply. That control will allow us to support our clinical programs and, in time, commercial supply, to help bring these investigational therapies, and those that follow, to more patients."
Full-Life describes itself as focused on developing next-generation targeted radioconjugates. It has three clinical-stage programs: [225Ac]Ac-FL-020, a PSMA-targeted alpha radioconjugate currently being evaluated in a global Phase 1 trial for metastatic castration-resistant prostate cancer (mCRPC); [225Ac]Ac-FL-261, a c-MET-targeted alpha radioconjugate being developed for multiple solid tumour indications, with an initial focus on non-squamous non-small cell lung cancer (nsNSCLC); and an NTSR1-targeted small-molecule radioconjugate currently being evaluated in a Phase 1 clinical trial under a collaboration with a strategic partner. The company says it has fully integrated capabilities spanning drug discovery, clinical development, Ac-225 production and manufacturing, and presents the Gembloux site as a GMP-compliant Ac-225 manufacturing and radiolabeling facility whose construction is complete.
Skills on the site, without a job figure
David Clarinval, Deputy Prime Minister and Federal Minister for Employment, the Economy and Agriculture, said: "Belgium has built a world-class nuclear medicine ecosystem, bringing together leading research centres, innovative pharmaceutical companies, advanced production capabilities and internationally renowned medical institutions. Full-Life's decision to establish a presence in Gembloux further strengthens this genuine "Radiopharma Valley" and highlights Belgium's attractiveness in a strategic and fast-growing sector. This investment will strengthen our industrial capabilities, create highly skilled jobs and help develop new expertise. It also reinforces Belgium's position as a leading hub for pharmaceutical innovation, delivering benefits for our economy and, above all, paving the way for increasingly innovative treatments for patients in Belgium and around the world."
The press release does not give a number of jobs created or still to be filled. The work described at Gembloux brings together industrial, pharmaceutical, scientific and nuclear skills, as well as the commissioning of an electron accelerator, radiolabeling and the future manufacture of a final drug product under a nuclear permit. Those disciplines are part of the engineering and IT landscape in Belgium, without any headcount being stated here.
Source: Full-Life Technologies, press release, 24 November 2026
Looking for Engineering & IT opportunities in permanent and freelance roles in Belgium? Browse the latest jobs on Engineering.jobs.
Olivier Lambert | Engineering.jobs
Are you a recruiter or employer? Publish your latest company news and job offers on Engineering.jobs to increase your company's visibility, strengthen your employer brand and attract future employees. Use our specialised engineering and IT CV database to find candidates who match your needs. Contact us today to find out more about our solutions.